Slugain Burn outline design drawing
File Location: N12025\Projects\202580598-Highland Council — Slugain Burn Restoration\1_WIP\C\Graphical\DR\PQZ-JBA-00 – 00-DR-C-0001-Non-Technical_Overview_Plan.dwg
- EXISTING SLUGAIN BURN CHANNEL TO BE INFILLED WITH SITE WON MATERIAL UP TO 10m DOWNSTREAM OF THE EXISTING BRIDGE CROSSING.
EXISTING BRIDGE CROSSING TO BE DEMOLISHED AND ROAD TO BE RESURFACED ON TOP OF THE INFILLED CHANNEL. DREDGED RIVER MATERIALS FORMING EMBANKMENTS TO BE USED AS BED MATERIAL FOR NEW CHANNEL
EXISTING ACCESS ROAD TO BE DEMOLISHED AND REDIRECTED AS SHOW ON THE PLAN.
- EXISTING SLUGAIN BURN CHANNEL UPSTREAM OF THE EXISTING BRIDGE TO BE INFILLED WITH SITE WON MATERIAL. ENCOURAGE DEVELOPMENT OF POOL-RIFFLE MORPHOLOGY DOWNSTREAM OF STEP POOL SEQUENCE. AVERAGE POOL LENGTH = 6.5m. AVERAGE RIFFLE LENGTH = 3m PROPOSED CHANNEL TO JOIN WITH UNNAMED WATERCOURSE. MODIFICATION OF CHANNEL TO ENCOURAGE TRANSITION FROM POOL-RIFFLE MORPHOLOGY TO ‘STAGE 0’ CONDITIONS CHANNEL ENCOURAGED TO CONNECT WITH FLOODPLAIN. HIGH FLOW EVENTS WILL ENABLE FLOWS TO RESHAPE BED MATERIALS AND CHANNEL FORM TO TRANSITION TO STAGE 0 MORPHOLOGY WITH MULTI-THREADED CHANNELS DOWN TO THE CONFLUENCE WITH THE RIVER DULNAIN
GENERAL NOTES
- ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.
- ALL COORDINATES ARE IN METRES RELATIVE TO ORDNANCE SURVEY NATIONAL GRID.
- DO NOT SCALE FROM THIS DRAWING. ALL DIMENSIONS MUST BE CHECKED/VERIFIED ON SITE.
- ANY DISCREPANCIES NOTED ON SITE ARE TO BE REPORTED TO THE SUPERVISOR IMMEDIATELY.
- THE LOCATIONS OF ANY KNOWN SERVICES SHOWN ON DRAWINGS ARE APPROXIMATE AND FOR GUIDANCE ONLY. SITE ADDRESS DULNAHAITNACH HIGHLAND SCOTLAND PH23 3AY OS NGR: NH 85484 20124 TC-TCTC-TC- ‑TC- EXISTING ROAD TO BE REMOVED INDICATIVE ROAD BRIDGE OVER NEW CHANNEL TC-TC CHANNEL UNNAMED WATERCOURSE TCTCTCTCTCTCTCTCTCTC TCTCTCTC-TC- TC-TCTC- TC- TC-TC- EXTENT OF EXISTING EXISTING CAR PARK TO BE RETAINED CHANNEL TO BE INFILLED WITH SITE WON MATERIAL CHANNEL INFILLED AND ROAD EXISTING BRIDGE TO BE DEMOLISHED WITH REDUNDANT PAVEMENT REINSTATED NEW SLUGAIN BURN CHANNEL. SEE FIGURE 6 FOR INDICATIVE STEP 이 POOL ARRANGEMENT EXISTING ACCESS ROAD FROM CARRBRIDGE DRAWING NOTES
- DRAWING TO BE READ IN CONJUNCTION WITH: PQZ-JBA-XX-XX-RP-EN-0001-S0-P01.03-Non_Technical_Summary TC- LEGEND PROPOSED 3m WIDE ACCESS ROAD INDICATIVE ROAD EMBANKMENT AT 1:3 SLOPE PROPOSED CHANNEL BED INDICATIVE CHANNEL EARTHWORKS AT 1:3 SLOPE EXISTING SLUGAIN BURN TO BE INFILLED WITH SITE WON MATERIAL WATERCOURSE FLOW DIRECTION LEGEND BT- UNDERGROUND TC- DIVERTED BT- UNDERGROUND TC- SECTION OF BT UNDERGROUND CABLE TO BE REMOVED/DIVERTED UTILITY SERVICES INVESTIGATION GAUGE TO PAS 128 TYPE D: DESK STUDY TYPE C: DESK STUDY WITH SITE RECONNAISSANCE TYPE B: DESK STUDY, SITE RECONNAISSANCE AND DETECTION SURVEY TYPE A: DESK STUDY, SITE RECON, DETECTION SURVEY AND TRIAL HOLES TYPE D 30/01/2025 TYPE C TYPE B TYPE A THE POSITION OF ANY EXISTING PUBLIC OR PRIVATE SEWERS, UTILITY SERVICES, PLANT OR APPARATUS SHOWN ON THIS DRAWING HAS BEEN OBTAINED FROM STATUTORY RECORDS. THE INFORMATION SHOWN IS BELIEVED TO BE CORRECT BUT NO WARRANTY TO THIS IS EXPRESSED OR IMPLIED. OTHER SUCH PLANT OR APPARATUS MAY ALSO BE PRESENT BUT NOT SHOWN. INVESTIGATIONS MUST BE UNDERTAKEN ON SITE CONFIRMING LOCATIONS BEFORE BREAKING GROUND. INDICATIVE ROAD REALIGNMENT CREATE NEW CHANNEL WITH 80M OF STEP POOL MORPHOLOGY WITH VARIATION IN DIMENSIONS TO MIMIC NATURAL VARIANCE THROUGHOUTREACH CHANNEL SIZED TO CONVEY 200+CC FLOWS IN BANKAND UNDER THE CHANNEL CROSSING CHANNEL SIZED TO CONVEY2- YEAR FLOWS AND STEP POOLS TO TIE INTO BED OF 2‑YEAR CHANNEL P01 Issued for review and comment Rev. Description Document Control Supplier Unit 2.1, Quantum Court Research Avenue South Heriot Watt Research Park Riccarton EDINBURGH EH14 4AP Project Title AVERAGE LENGTH OF STEP + POOL=5.71m AVERAGE DEPTH OF POOL AT DEEPEST POINT=0.6m This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of His Majesty’s Stationery Office Crown copyright 2025. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence No. 100024198
- EXISTING SLUGAIN BURN CHANNEL UPSTREAM OF THE PROPOSED TRANSITION POINT TO THE NEW CHANNEL.
- INDICATIVE SKETCH OF STEP POOLS ARRANGEMENT. Drawing Title 27/06/25 JN KM DS ST Date Author Designer Checker Approver T: +44 (0)131 319 2940 E: info@jbaconsulting.com www.jbaconsulting.com Twitter @JBAConsulting JBA SLUGAIN BURN RESTORATION OUTLINE DESIGN NON-TECHNICAL OVERVIEW PLAN The Highland Council Comhairle na Gàidhealtachd Cairngorms National Park Pàirc Nàiseanta a’ Mhonaidh Ruaidh Parent Model NOT FROM MODEL Security Classification CONFIDENTIAL Author AVERAGE ELEVATION CHANGE BETWEEN STEPS 0.2m J. Ness Suitability Designer K. Mularska Scale 1:600 Checker Approver D. Scoular S. Thomson Status Revision S3 P01 A1 Sheet Size SHARED FOR REVIEW AND COMMENTS Information Container PQZ-JBA-00 – 00-DR-C-0001-Non-Technical_Overview_Plan