Skip to content

Slugain Burn restoration project documents

6 October 2025

This document contains an outline design for the Slugain Burn restoration project. It details plans to infill existing channels with site-won material, remove existing infrastructure like a bridge and access road and redirect the access road. The project includes creating a new channel with step-pool morphology to encourage a transition to stage 0 conditions. The drawing provides details on channel dimensions, road realignment, and utility services, along with general notes and legends for interpretation.
Please be aware that this summary has been generated using AI.
×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!