Draft Core Paths Plan - Consultation Report and Representations received
Outdoor Access
28th July, 2008
A report summarising the results of the consultation on the Draft Core Paths Plan which took place from 01 April to 30 June 2008 can be downloaded below along with all responses received.
The Summary Table lists the responses in numerical order by their reference number. This can be used for reference or to help decide which file you want to open.
21 files
- CPP Consultation Report and Representations received - PDF Download (289.15KB)
- TXT Download (29.47KB)
- CPP Representations - Summary Table - PDF Download (75.18KB)
- TXT Download (19.75KB)
- Responses 3-1 to 3-5 - PDF Download (878.25KB)
- Responses 3-6 to 3-10 - PDF Download (738.32KB)
- Responses 3-11 to 3-15 - PDF Download (738.89KB)
- Responses 3-16 to 3-20 - PDF Download (788.58KB)
- Responses 3-21 to 3-25 - PDF Download (608.54KB)
- Responses 3-26 to 3-30 - PDF Download (491.44KB)
- Responses 3-31 to 3-35 - PDF Download (210.07KB)
- Responses 3-36 to 3-40 - PDF Download (373.07KB)
- Responses 3-41 to 3-45 - PDF Download (503.54KB)
- Responses 3-46 to 3-50 - PDF Download (494.56KB)
- Responses 3-51 to 3-55 - PDF Download (626.43KB)
- Responses 3-56 to 3-60 - PDF Download (496.14KB)
- Responses 3-61 to 3-65 - PDF Download (420.33KB)
- Responses 3-66 to 3-69 - PDF Download (661.68KB)
- Responses 3-71 to 3-75 - PDF Download (1,003.95KB)
- Resposes 3-79 to 3-82 - PDF Download (586.38KB)